The Town of Exeter contracted the removal of the historic Great Dam and restoration of the Exeter River corridor. The scope includes demolition of concrete dam structures, removal of fish weir and ladder, river‑bed grading, installation of a dry‑hydrant, modification of the town’s pump station, and extensive ecological restoration with native planting and rock‑armored banks. The work is to be performed under a stipulated‑price contract with unit‑price items, with a construction schedule of roughly four months in mid‑2016, and includes extensive environmental compliance (wetlands, Section 404, Section 401) and vibration‑monitoring requirements.