Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wyoming guideWyoming Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wyoming
  4. ›Construction
  5. ›UW Arena Auditorium - Phase 2 Additions and Renovations

Awarded contract·University of Wyoming·Wyoming

UW Arena Auditorium - Phase 2 Additions and Renovations

Won by Sletten Construction of Wyoming, Inc.$12.7MSingle Award
Contract source

Awarded vendors

  • Sletten Construction of Wyoming, Inc.

Description

The University of Wyoming is seeking a contractor to perform additions and renovations to the Arena Auditorium. The project includes structural and miscellaneous selective demolition, general construction, electrical and data wiring, lighting, plumbing, HVAC, elevator, flooring, casework, painting, tile, and other interior finishes. The contract was awarded to Sletten Construction of Wyoming, Inc. with a base bid of $12,720,000.00. The project also includes several alternates, including a polished concrete finish, a gypsum board finish, and a second domestic hot water heater. • The project is located in Laramie, Wyoming • The contract was awarded through a competitive bidding process • The project includes a pre-qualification process for bidders • The contract includes a mandatory pre-bid meeting and walk-through

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
236220
Solicitation №
16-001

Contract value

$12,720,000

Based on the bid tabulation, the contract value is estimated to be around $12,720,000.00, which is the base bid amount. This estimate is based on the assumption that the contractor will complete all the work outlined in the contract documents. Factors that may influence the contract value include changes to the scope of work, unforeseen site conditions, and changes to the project schedule.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

The University of North Carolina·North Carolina

Top match · 69%

Academic Commons Phase 2 - Building Addition

Closes 11/17/2026Opened 10/26/2026

Northeastern Illinois University·Illinois

67% match

Invitation for Construction Bid: Florida Avenue Residence Halls - Restroom Reno

Closes 11/10/2026Opened 10/9/2026

City of Flowood·Mississippi

66% match

Flowood Underwood Auditorium

Closes 11/12/2026Opened 10/7/2026

Connecticut YWCA Hartford Region·Connecticut

66% match

YWCA Hartford Region – Drywall & Specialties

Closes 12/1/2026Opened 10/29/2026

Minnesota State University, Mankato·Minnesota

66% match

Taylor Center - Bresnan Wood Floor Replacement

Closes 11/12/2026Opened 10/19/2026

The University of North Carolina·North Carolina

66% match

New Residence Hall 1 - Full Building Round 2-Revised

Closes 11/12/2026Opened 10/13/2026

Connecticut Albertus Magnus College·Connecticut

66% match

Albertus Magnus College, Ralph Walker Rink – Women’s Locker Room

Closes 11/12/2026Opened 10/27/2026

University of North Dakota·North Dakota

66% match

FM362 UND SMHS Student Affairs Renovation

Closes 11/10/2026Opened 10/13/2026

University System of New Hampshire·New Hampshire

66% match

UNH Lord Hall Building Entrance Modifications

Closes 11/20/2026Opened 10/21/2026

University of North Dakota·North Dakota

66% match

UND School of Medicine & Health Sciences Student Affairs Renovation

Closes 11/10/2026Opened 10/13/2026

The University of North Carolina·North Carolina

65% match

Residence Hall Renovations - Beall and Bryan

Closes 11/17/2026Opened 10/26/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

65% match

Rockwood Hall Entrance at Rockwood Hall of Rockefeller State Park Preserve

Closes 11/19/2026Opened 10/15/2026

Winooski School District·Vermont

65% match

Gym Flooring and Upgrades

Closes 11/30/2026Opened 10/22/2026

Northeastern Illinois University·Illinois

65% match

Invitation for Construction Bid: Meat Science Lab HVAC Ugrades & Interior Remodel

Closes 11/12/2026Opened 10/9/2026

The University of North Carolina·North Carolina

65% match

New Residence Hall 1 - Full Building Round 2

Closes 11/12/2026Opened 10/13/2026

Connecticut Albertus Magnus College·Connecticut

65% match

Albertus Magnus College, Ralph Walker Rink – Women’s Locker Room

Closes 11/12/2026Opened 10/27/2026

City and County of Denver·Colorado

65% match

RFP: Boettcher Concert Hall Renovation CM/GC

Closes 12/2/2026Opened 10/22/2026

City of Fayetteville·Arkansas

65% match

Construction - FYV Hangar Infrastructure Improvements (Phase 2)

Closes 11/3/2026Opened 10/11/2026

The University of North Carolina·North Carolina

65% match

George Watts Hill Alumni Center - Addition and Renovation

Closes 11/19/2026Opened 10/6/2026

University Of Texas At Austin·Texas

64% match

KIN CP2001827 North Tower Rm Renovations

Closes 11/13/2026Opened 10/12/2026

Fox Valley Technical College·Wisconsin

64% match

Restroom Remodel – Entrance #10

Closes 11/2/2026Opened 10/7/2026

Toledo Area Regional Transit Authority·Ohio

64% match

Transit Hub Interior Renovations

Closes 11/6/2026Opened 9/9/2026

East Tennessee State University·Tennessee

64% match

COM Bldg 2 Learning Community Renovation

Closes 10/31/2026Opened 9/10/2026

City of Evanston·Illinois

64% match

BID 26-47 Fleetwood Jourdain Center - Interior Improvements

Closes 11/17/2026Opened 10/15/2026

South Carolina

64% match

Russell House Student Union Expansion and Reno

Closes 11/18/2026Opened 10/29/2026