This contract covers the comprehensive resurfacing of Goddard Memorial Drive (M26‑2) and adjacent streets in Worcester, MA. The work includes cold‑in‑place recycling (CIR) with foamed‑asphalt stabilization, hot‑mix asphalt (SUPERPAVE) placement, installation of granite curbs, concrete sidewalks, drainage structures, pavement markings, and a full traffic‑management plan. The City mandates compliance with MWBE participation goals, prevailing‑wage requirements, weekly certified payroll reporting, and extensive safety and environmental controls.
• Scope: CIR, hot‑mix asphalt, curb/sidewalk repair, utility adjustments, signage, and night‑time illumination.
• Requirements: 5 % bid bond, performance & payment bonds equal to contract price, insurance minimums, MWBE and wage‑theft certifications, and weekly reporting.
• Schedule: Pre‑bid conference 29 Jul 2026, bid opening 12 Aug 2026, substantial completion by 15 Nov 2027, with a $360,436 contingency reserve.