The contract is for the furnishing and installation of a seamless epoxy flooring system at Kane-Scott, resident shower floor 3A. The contractor will provide 700 sq. ft. of flooring, including 175 lineal ft. of 6" coved base, as described in the scope of work. The contract period is from January 1, 2019, to March 31, 2019. The estimated cost of the contract is $19,000.00.
• The contract was awarded to Allegheny Installations Company.
• The point of contact for the contract is Jason Sterner.
• A site visit is required, and Vince Klingensmith can be contacted for arrangements.
• The contract is for a specific project, and the scope of work is clearly defined.
• The contract has a fixed price of $19,000.00.
• The contract period is for 90 days.