The contract is for the road reconstruction of West Gulf Bank Road from I-45 to Airline Drive for Harris County Precinct 2. The project includes drainage improvements, pavement reconstruction, and traffic control measures. The contract was awarded to Allgood Construction Company Inc. for $16,765,190.29. The scope of work includes removing old asphaltic surface and base material, milling existing pavement, and constructing detours for two-way traffic. The project aims to improve drainage, vehicular, and pedestrian conditions in the Aldine area.
• The contract includes the reconstruction of approximately 5 lanes with sidewalks, storm sewers, water, sanitary, and traffic signals.
• The project involves the removal and disposal of existing asphaltic surface and base material.
• The contractor will construct detours for two-way traffic and install temporary traffic control devices.
• The contract includes the installation of reinforced concrete pavement, concrete curbs, and sidewalks.
• The project aims to improve drainage and reduce flooding in the area.