This contract awards a single‑award, lump‑sum demolition project for the Barkley’s Creek residence. The work consists of a complete demolition of a residential structure, performed under Washington State DCNR oversight, with a baseline engineer’s estimate of $266,513. Six firms submitted bids ranging from $151,700 to $363,490 (pre‑tax). After compliance verification, Gec NW Inc was identified as the lowest responsive bidder and the recommended awardee. The solicitation required standard bid deposits, bidder qualification statements, and acknowledgment of addenda, and all bidders satisfied these requirements. The award follows a full and open competition process, with no set‑aside or renewal provisions disclosed.
• Scope: Lump‑sum demolition of a single residential building.
• Budget: Engineer’s estimate $266,513; award‑recommended total (including WA tax) $220,706.72.
• Vendors: Six bidders competed; Gec NW Inc selected as the awardee.
• Timeline: Bids due 3/28/2023; award announced 5/16/2023.