The Canyon Lake Drive Concrete Repair Project involves repairing storm sewer pipe and settled concrete east of Evergreen Drive. The project was advertised with an engineer's estimate of $50,000.00. The bid results table lists several bidders with their corresponding base bids. The lowest base bid was $43,341.05 from Complete Concrete. The project includes a pre-bid conference and several documents, including front-end documents and plans.
• The project requires repairing storm sewer pipe and settled concrete.
• The engineer's estimate is $50,000.00.
• The bid results table lists several bidders with their corresponding base bids.
• The lowest base bid was $43,341.05 from Complete Concrete.
• The project includes a pre-bid conference and several documents.