The 2019 Bike Trail Resurfacing Project is a contract awarded by the City of Roseville for the resurfacing of bike trails throughout the city. The project includes striping and vegetation removal, Type I slurry seal, permanent paint striping, traffic control, and sweeping. The engineer's estimate for the project is $336,000. The contract was awarded to the lowest bidder, Pavement Coatings Co., with a bid of $248,500. Key aspects of the contract include:
• Resurfacing of bike trails throughout the city
• Striping and vegetation removal
• Type I slurry seal
• Permanent paint striping
• Traffic control and sweeping
• Engineer's estimate: $336,000
• Bid amount: $248,500