The contract is for the construction of a new control point at Brittan Avenue, which includes the installation of two left-hand and two right-hand turnouts with power switch machines and a pre-wired signal house. The project also involves the removal and salvage of approximately 2,120 feet of existing tracks, installation of two retaining walls, CIP concrete deck slab and concrete stairs, and the installation of fencing at the signal houses. The contract has a DBE goal of 6%, and the bidders are required to submit a DBE commitment form with their bid. The contract was awarded to multiple vendors, including Balfour Beatty Infrastructure, Inc., DMZ Builders, Proven Management, Inc., and RailWorks Track Services, Inc. Some key features of the contract include:
• The project location is at Brittan Avenue and El Camino Real in San Carlos, CA
• The contract has a total bid amount of $3,205,825.86 for Balfour Beatty Infrastructure, Inc.
• The contract has a total bid amount of $5,733,976.00 for RailWorks Track Services, Inc.
• The contract has a total claimed DBE participation of 6.60% for Balfour Beatty Infrastructure, Inc.
• The contract has a total claimed DBE participation of 6.95% for RailWorks Track Services, Inc.