This contract involves complete nuisance abatement and demolition of all structures at 1210 Alba Street, Mobile, AL, including utility disconnection, hazardous‑material handling, erosion control, and final site stabilization. The work must be performed using a wet‑demolition method, with detailed photographic and documentation deliverables, and strict timelines (30‑day completion with liquidated‑damage penalties).
• Wet demolition of structures, footings, slabs, and piers, plus removal of debris, vegetation, and trees ≤ 8″ DBH.
• Utility line caps (sewer, water, gas), LBP/ACM disposal per NESHAP, and comprehensive erosion‑control BMPs (temporary and permanent).
• Mandatory post‑completion documentation: photos, waste‑shipment records, lien releases, and newspaper notice of final completion.