This contract involves the complete demolition of existing structures at 500 Chin Street, Mobile, AL, including utility disconnections, hazardous‑material handling, erosion control, and post‑demolition site restoration. The City of Mobile’s Municipal Enforcement Department issued an RFQ (ME‑008‑25) and selected DEESE LAWN CARE as the awardee. The work must be performed under a strict schedule (30 calendar days from notice‑to‑proceed) and includes extensive documentation, insurance, and compliance requirements (E‑Verify, lead‑asbestos disposal, BMPs, final newspaper notice).
• Wet demolition of all structures, footings, slabs, and associated debris.
• Utility capping (sewer, water, gas) and hazardous‑material (lead‑paint, asbestos) waste management with required disposal documentation.
• Erosion‑and‑sediment control BMPs, permanent site stabilization, seeding, and final newspaper advertisement of completion.
• Mandatory post‑award documentation (E‑Verify, insurance, signed agreement, AIA forms) and liquidated‑damages provision ($250 per day after a 15‑day grace period).