This sealed “All‑or‑None” bid from the City of Mobile seeks a contractor to replace the existing mulch median on Grelot Road with topsoil and centipede‑grass sod, while preserving Crepe Myrtle trees. The scope includes mulch removal, soil grading, sod installation, irrigation until rooting, debris disposal, traffic control, and compliance with strict work‑hour windows and a 90‑day warranty. The contractor must hold a General Contractor License, provide E‑Verify proof, and meet extensive insurance requirements (minimum $1 million per occurrence, $2 million aggregate). A 5 % bid bond is required, and if the contract exceeds $50,000, a minimum 15 % participation by socially/economically disadvantaged individuals is mandated. No vendor has yet been identified.
• Remove mulch ≥ 24 in from Crepe Myrtle bases, keep trees intact.
• Grade median, install centipede‑grass sod ≤ 1/8 in above curb, water until rooted.
• Provide traffic control, dispose of all debris, work only 8 a.m.–4 p.m. (Mon‑Fri) and any time on weekends.
• Submit a 5 % bid bond, meet detailed insurance limits, and furnish a 90‑day warranty.