The contract is for the replacement of the North Gate at the OPS facility, including demolition of the current gate and installation of a new automatic gate. The project requires electrical connections and terminations as needed. The engineer's estimate for the project is $85,000.00. The contract was awarded to Automatic Door and Gate. Key aspects of the contract include:
• The project requires demolition and installation of a new automatic gate
• Electrical connections and terminations are required as part of the project
• The engineer's estimate for the project is $85,000.00
• The contract was awarded to Automatic Door and Gate
• The project is located at 1802 75th Street SW, Everett, WA in Snohomish County, WA.