This contract concerns the demolition and complete removal of existing structures at 1250 O’Donnell Street, Mobile, AL, including utility capping, hazardous‑material handling, erosion control, and site restoration. The City of Mobile Municipal Enforcement Department issued a sealed‑envelope RFQ (ME‑070‑24) with a bid deadline of 19 Mar 2025, and the award was made to DEESE LAWN CARE. The work must be performed using wet‑method demolition to control lead‑based paint and asbestos, with all debris disposed of at a permitted landfill, and the site must be stabilized and seeded before final turnover. The contractor must also submit insurance, E‑Verify proof, signed AIA forms, and post‑completion documentation, including newspaper notice of final completion.
• Wet‑method demolition of all structures, footings, and slabs with full debris removal.
• Utility disconnection and capping, hazardous‑material (LBP/ACM) disposal, BMP installation, and final site seeding.
• Strict documentation and close‑out requirements (photos, waste manifests, AIA forms, newspaper proof) plus liquidated‑damage penalties for late completion.