The contract is for the construction of the Module 5, Phase D Liner System at the Neal Road Recycling and Waste Facility. The work includes preparing the subgrade, placing general fill, furnishing and installing landfill liner components, and furnishing and installing landfill gas collection piping. The contract was re-posted due to a clerical error, and only those who attended the site walk on May 17, 2022, are eligible to submit a bid. The bid results show two bidders, Anderson Oragline and Ford Construction, with bid amounts of $1,396,686.00 and $929,248.00 respectively.
• The contract is for a specific project at the Neal Road Recycling and Waste Facility.
• The work includes various components such as subgrade preparation, general fill, and landfill liner installation.
• The contract was re-posted due to a clerical error.
• Only those who attended the site walk on May 17, 2022, are eligible to submit a bid.
• The bid results show two bidders with different bid amounts.