Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Illinois guideIllinois Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Illinois
  4. ›Water and Wastewater
  5. ›2023 Sanitary Sewer System Lining, Capital Project No. 2437

Awarded contract·Four Rivers Sanitation Authority·Illinois

2023 Sanitary Sewer System Lining, Capital Project No. 2437

Won by Visu-Sewer of Illinois, LLC$1.9MSingle Award
Contract source

Awarded vendors

  • Visu-Sewer of Illinois, LLC

Description

This contract involves the rehabilitation of approximately 28,000 linear feet of existing sanitary sewer mains in the City of Rockford, Illinois, using cured‑in‑place pipe (CIPP) lining. The work includes high‑velocity jet cleaning, TV inspection, grouting of pipe joints, installation of resin‑impregnated liners, service reinstatement, removal of protruding services, traffic control, public notification, and all required permitting and testing. The award is a single‑bid award to Visu‑Sewer of Illinois, LLC, with a total bid of roughly $1.89 million. Key points: • Scope covers 8‑ to 18‑inch sewer pipe sections, with a completion milestone of February 29 2024. • Contractor must provide a 5 % bid bond, 100 % performance bond, and meet extensive insurance and prevailing‑wage requirements. • Required deliverables include detailed construction schedules, third‑party test data, traffic‑control plans, safety programs, and a two‑year warranty (potential 10‑year warranty). • The project is financed by Four Rivers Sanitation Authority, a public‑utility entity, and follows IDOT and ASTM standards.

Attached files

Key dates

Bids closed
6/20/2023
Contract modified
6/7/2023

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
23-406

Contract value

$1,888,960

The bid tabulation shows the low‑bid total for Visu‑Sewer of Illinois, LLC at $1,888,960. This figure likely represents the full contract amount, as the tabulation includes all base‑bid items and optional alternates. No separate “maximum allowable” or “budget ceiling” is disclosed, so the best estimate of contract value is the low‑bid total of roughly $1.89 million. Factors influencing this estimate include the extensive linear‑footage of CIPP work (over 5,000 LF across multiple diameters), the inclusion of service reinstatements, grouting, chemical grout, and traffic‑control provisions. Given the scope and the standard unit rates for trenchless pipe rehabilitation, a contract value in the $1.8‑$2.0 million range is reasonable.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Ann Arbor·Michigan

Top match · 75%

2027 Sewer Lining Project

Closes 12/2/2026Opened 10/30/2026

City of Marysville, Ohio·Ohio

75% match

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

City of Independence·Missouri

74% match

2024 Neighborhood Sanitary Sewer CIP Project No. 302004-2

Closes 11/4/2026Opened 10/7/2026

Saline County·Kansas

74% match

2026 Pipe Lining Project

Closes 11/24/2026Opened 10/19/2026

City of Ponca·Oklahoma

74% match

Ponca City Sanitary Sewer Bois D Arc' Phase III

Closes 1/30/2027Opened 1/14/2025

The City of Columbus·Ohio

73% match

RFQ033611 - Central College Subtrunk, Phase 3 (650033-100003)

Closes 11/18/2026Opened 9/30/2026

Delaware County Regional Sewer District·Ohio

73% match

2025 Sewer Rehabilitation Project

Closes 11/17/2026Opened 10/13/2026

City of West Des Moines·Iowa

73% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

Jefferson Parish Government·Louisiana

73% match

Bid Event #303 Two (2) Year Contract for Preventive Maintenance (Lining) of Existing Sanitary and Storm Sewers, Including Service Laterals at Various Locations for the Jefferson Parish department of Sewerage

Closes 1/5/2027Opened 10/28/2026

City of Raytown·Missouri

72% match

2026 Sanitary Sewer Maintenance Project: White Oak West

Closes 11/18/2026Opened 10/22/2026

City of South San Francisco·California

72% match

2027 Sanitary Sewer Spot Repair and Rehabilitation Project

Closes 11/13/2026Opened 10/21/2026

City of Columbus Ohio·Ohio

72% match

Central College Subtrunk – Phase 3

Closes 11/18/2026Opened 9/8/2026

Gary Sanitary District·Indiana

72% match

Request For Quotes Sanitary Sewer Lining at 8535 Lakewood Avenue

Closes 11/5/2026Opened 10/21/2026

City of Columbus·Ohio

71% match

Central College Subtrunk, Phase 3 (650033-100003)

Closes 11/18/2026Opened 9/2/2026

U.S. Department Of Defense·Indiana

71% match

Section 219 Chesterton Interceptor Rehab

Closes 10/15/2027Opened 10/15/2026

City of Lynchburg·Virginia

71% match

IFB 2027-027 CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

Louisiana Jefferson Parish·Louisiana

71% match

Two (2) Year Contract for Preventive Maintenance (Lining) of Existing

Closes 1/5/2027Opened 10/28/2026

City of Rapid City·South Dakota

71% match

2027 Sanitary Sewer Televising

Closes 11/10/2026Opened 10/24/2026

City of Thomas·Oklahoma

70% match

City of Thomas Public Sewer Improvements - Relocation of Public Sewer Line ODOT SH 33

Closes 11/24/2026Opened 10/23/2026

City of Philadelphia·Pennsylvania

70% match

PW Bid 2521-SEWER RECONSTRUCTION and RELAY of WATER MAINS in MANTON ST FROM S. 8TH ST to S. 7TH ST

Closes 11/10/2026Opened 10/28/2026

U.S. Department Of Defense·Missouri

70% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

City of Braintree·Massachusetts

70% match

Sewer System Rehabilitation - Year 13

Closes 11/5/2026Opened 10/14/2026

City of Cleveland·Ohio

70% match

120-26 - Constructing & Installing Replacement Sewers & Repairing & Rehabilitation of Existing Sewers

Closes 12/2/2026Opened 10/29/2026

City of Elgin·Illinois

70% match

Chicago Street Combined Sewer Separation Project

Closes 11/10/2026Opened 10/8/2026

Fort Bend County Municipal Utility District No. 134A·Texas

70% match

Offsite Water Line Loop, Sanitary Sewer and Force Main to Serve Fort Bend County Municipal Utility District No. 134A

Closes 11/6/2026Opened 10/1/2026