This contract is a City of Mobile nuisance‑abatement demolition project for a structure located at 502 Stanton Road. The city issued an RFQ (ME‑092‑21) on December 10 2021, received sealed quotes by December 15 2021, and subsequently awarded the job to FREMIN VENTURES, LLC. The work requires wet demolition, utility cap‑off, hazardous‑material handling (lead‑based paint and possible asbestos), erosion‑control BMPs, site clearing, and post‑demolition re‑vegetation, all completed within a 15‑day substantial‑completion window. The contract is a stipulated‑sum, fixed‑price agreement with strict documentation, insurance, and E‑Verify requirements.
• Wet demolition of the entire structure, including footings, slabs, and masonry.
• Mandatory utility disconnection/capping, lead‑based paint/asbestos disposal, and temporary/ permanent erosion control per Clean Water Act regulations.
• Site restoration (topsoil, seeding, mulching) and final newspaper notice of completion.