This municipal contract covers a comprehensive capital‑improvement package for the Elmside Boulevard, Sommers Avenue, and Center Avenue corridor in Madison, WI (Assessment District 15). The work includes full street reconstruction, utility relocation, and associated infrastructure upgrades.
• Street reconstruction: new HMA pavement, concrete sidewalks, curb‑and‑gutter, curb ramps, detectable warning fields, and median islands.
• Utility work: installation of new 6‑in. and 8‑in. water mains, replacement of existing sanitary and storm‑sewer pipes (PVC, RCP, VCP), sewer access structure removal, and coordination with multiple utilities (AT&T, Charter, MGE).
• Erosion‑control and drainage: silt‑sock placement, polymer coating, inlet protection, storm‑sewer inlets, catch‑basins, and temporary erosion‑control measures.
• Traffic‑control and markings: epoxy pavement markings, temporary crosswalks, signage, and construction fencing.
The contract is a Best‑Value, lump‑sum award valued at $3.78 M, with a 135‑day completion schedule (by 20 Nov 2026).