The City of West Palm Beach awarded a contract for the design‑build construction and rehabilitation of sidewalks at Northmore Elementary School. The scope includes new sidewalk installation, replacement of damaged sections, milling, resurfacing, restriping, and related site work such as swale re‑grading, clearing, and grubbing. The contract emphasizes compliance with FDOT’s race‑neutral program (10.54% DBE goal) and the use of certified DBEs.
• Construction of new sidewalks and replacement of existing damaged sidewalks.
• Milling, resurfacing, and restriping of pavement surfaces.
• Swale re‑grading, clearing, and grubbing to ensure proper drainage.
• Requirement to meet FDOT DBE participation goals (10.54%).
• Awarded through a public bidding process posted on DemandStar.
Attached files
The award documents live at the source — open the contract source above to download them.