Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Environmental Services
  5. ›Bainbridge Environmental Consultants, Inc. - Bldg. 4 Water…

Awarded contract·Mt. San Antonio College·California

Bainbridge Environmental Consultants, Inc. - Bldg. 4 Water Damage Mold Remediation

Won by Bainbridge Environmental Consultants, Inc.$6kSingle Award
Contract source

Awarded vendors

  • Bainbridge Environmental Consultants, Inc.

Description

This contract is for the provision of mold remediation services for Building 4 at Mt. San Antonio College. The contract was awarded to Bainbridge Environmental Consultants, Inc. and has a duration of 3 months. The contract value is estimated to be $5,970. The scope of work includes the remediation of water damage and mold in the building. Key points to consider are the timeline for completion, the budget allocated for the project, and the qualifications and experience of the vendor. • The contract duration is 3 months, indicating a relatively short-term project. • The contract value is $5,970, which is a relatively small amount, suggesting a limited scope of work. • The vendor, Bainbridge Environmental Consultants, Inc., has been selected based on their expertise and experience in mold remediation services. • The contract includes the provision of all necessary equipment, materials, and labor to complete the remediation work. • The college will provide access to the building and necessary utilities for the vendor to complete the work.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Starts
3/6/2025
Ends
6/30/2025
Duration
3 months

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Environmental Services
NAICS
541620

Contract value

$5,970

The contract value is explicitly stated as $5,970. This amount is likely based on the scope of work, which includes the remediation of water damage and mold in Building 4. Factors that may influence the contract value include the size of the building, the extent of the water damage and mold, and the qualifications and experience of the vendor.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Connecticut City of Norwich·Connecticut

Top match · 75%

Greeneville Fire House Mold Remediation

Closes 11/5/2026Opened 10/7/2026

U.S. Department Of The Interior·Florida

75% match

Mold remediation, Merritt Island NWR

Closes 11/16/2026Opened 10/29/2026

City of Baltimore·Maryland

74% match

Professional Mitigation and Restoration Services

Closes 12/2/2026Opened 10/30/2026

Hawaii Department of Defense·Hawaii

72% match

Mold removal and deep cleaning inside Bldg. 1784 ground, second, and third floor interior surfaces

Closes 11/4/2026Opened 10/19/2026

Maryland·Maryland

72% match

Professional Mitigation and Restoration Services

Closes 12/2/2026Opened 10/31/2026

Washington Ecology, Department of·Washington

72% match

2024 Residential Cleanup Group

Closes 11/3/2026Opened 9/16/2026

Alabama Department of Conservation and Natural Resources·Alabama

72% match

Conservation/Parks/Roland Cooper- Mold remediation

Closes 11/11/2026Opened 10/29/2026

Toledo - Lucas County Port Authority·Ohio

71% match

Remedial Action for Lower Maumee River Sway Bridge within the Maumee Area of Concern

Closes 12/8/2026Opened 10/29/2026

Miami-Dade County Seaport Department·Florida

71% match

Moisture Restoration Services-Portwide

Closes 11/11/2026Opened 10/16/2026

U.S. Department Of Defense·United States of America

71% match

ENVIRONMENTAL REMEDIATION SERVICES MULTIPLE AWARD TASK ORDER CONTRACT W912P9

Closes 11/12/2026Opened 10/28/2026

City of Waterbury·Connecticut

70% match

Lead Hazard Reduction & Healthy Homes Intervention 64 Stiles St, Waterbury, CT

Closes 11/17/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

70% match

SB ERS MATOC, USACE Northwestern Division and EPA Region 2

Closes 11/16/2026Opened 9/29/2026

Connecticut Town of Old Saybrook·Connecticut

70% match

Water Pollution Control Authority Environmental Studies

Closes 11/23/2026Opened 10/26/2026

U.S. Department Of Defense·Missouri

70% match

St. Louis District Environmental Consulting Services

Closes 9/2/2027Opened 9/2/2026

U.S. Department Of The Interior·Utah

70% match

F--Post-Flood Cleanup and Disaster AbatementSand Is

Closes 11/4/2026Opened 10/30/2026

City of Waco·Texas

70% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

New York City Department of Environmental Protection·New York

70% match

82627B0022-BEDC-NR-107: Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

70% match

Region 7 Southeast Mines Superfund Site

Closes 11/6/2026Opened 10/21/2026

U.S. Department Of Defense·Missouri

70% match

SB ERS MATOC, USACE Northwestern Division and EPA Region 2

Closes 11/16/2026Opened 7/30/2026

New York City Department of Environmental Protection·New York

70% match

82626B0042-BWT-WI-323 Reconstruction of MSP Cone Check Valves, Actuators and Discharge Piping at Wards Island WWTP

Closes 1/4/2027Opened 8/31/2026

U.S. Department Of Defense·United States of America

70% match

Architectural-Engineering Services for Hazardous, Toxic, and Radioactive Waste Services for Various Locations within the U.S. Army Corps of Engineers New England District Mission Boundaries and Other North Atlantic Division Mission Boundaries

Closes 1/29/2027Opened 10/29/2026

Texas City of Waco·Texas

69% match

Flat Creek Reuse Project Phase 1A

Closes 12/1/2026Opened 10/2/2026

Lucas County, OH Facility Management·Ohio

69% match

CIP 26-012 Jail Subsurface Water Remediation – Basement Water Remediation at Lucas County Correction Center

Closes 11/12/2026Opened 10/13/2026

Massachusetts City of Newburyport·Massachusetts

69% match

IFB No. 27-07 Bartlet Mall Restoration Project

Closes 12/17/2026Opened 10/28/2026

U.S. Department Of Veterans Affairs·Texas

69% match

Testing & Inspecting, Preventative Maintenance, Corrective Repair, Emergency Repair, and Service Calls Amendment 0002

Closes 11/18/2026Opened 10/28/2026