Oregon State University issued a competitive RFP (2022‑007770) to replace the roof on Milam Hall, a multi‑section academic building in Corvallis. The scope includes full roof demolition, asbestos‑containing material abatement (to be priced in the base bid), installation of a new SBS roofing system (with an optional EPDM alternate), insulation work, masonry restoration, and structural preparations for possible future solar racking. The contract requires a 100 % performance and payment bond, prevailing‑wage compliance, and a detailed phasing and schedule plan to keep the building weather‑tight throughout construction. Gerding Builders was selected for the base bid and two optional alternates, with a total awarded value of $4,019,618. The procurement was conducted via a one‑ or two‑step RFP with mandatory site‑visit attendance, electronic sealed proposals, and a strong emphasis on schedule/phasing (35 pts) and price (35 pts).