The contract is for the extension of sanitary sewer mains in the 12th St., Fulton St. and Alley Blocks 32 & 41 Blvd. Add. area. The project aims to correct non-conforming service lines. The bid summary table lists two vendors, Mainline Contracting, Inc. and Hills Materials Company, with base bids of $618,837.70 and $559,974.22, respectively.
• The project involves the extension of public sewer mains to correct failing sewer service lines.
• The bid submission date was June 30, 2015, at 4:00:00 PM EDT.
• A pre-bid conference was held on June 23, 2015, at 11:30:00 AM EDT.
• The bid results are available for download as a PDF document.
• The contract was awarded to Mainline Contracting, Inc. and Hills Materials Company.