This contract is for the 2022 Hot Mix Asphalt Paving 2 project, which involves full depth reclamation of existing pavement, milling, placement of hot mix asphalt base and surface courses, construction of driveway tie-ins, and other related work. The contract was awarded to Gray & Son, Inc. for $5,586,559.60. The project requires the contractor to perform various tasks such as adjusting and rebuilding inlets, manholes, and valve boxes, pipe replacements, filling of shoulder drop-offs, and stabilization of disturbed areas. The contractor must also maintain traffic and perform all incidental work as indicated in the specifications or special provisions.
• Full depth reclamation of existing pavement
• Milling of existing pavement
• Placement of hot mix asphalt base and surface courses
• Construction of driveway tie-ins
• Adjusting and rebuilding of inlets, manholes, and valve boxes
• Pipe replacements
• Filling of shoulder drop-offs
• Stabilization of disturbed areas
• Maintenance of traffic
• All incidental work as indicated in the specifications or special provisions