This contract involves the construction of handicap ramps and sidewalks. The project includes concrete removal, curb removal, excavation, sidewalk construction, curb ramp construction, and truncated dome pads installation. The bid tab section lists the item numbers, units of measurement, quantities, descriptions, unit costs, and total costs for each company that bid on the project. The companies that bid on the project are DRC Construction, Bruce's General Construction, Widgeon, Texcavation, and W and W Construction.
• The project requires the removal of concrete and curbs.
• The project involves the excavation and construction of sidewalks and curb ramps.
• The project includes the installation of truncated dome pads.
• The bid tab section provides a detailed breakdown of the costs associated with each item.
• The contract was awarded through a competitive bidding process.