Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wyoming guideWyoming Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wyoming
  4. ›Sevenmile Creek Pre-Commercial Thinning Project

Awarded contract·State of Wyoming, Department of Administration and Information, Purchasing Section·Wyoming

Sevenmile Creek Pre-Commercial Thinning Project

Won by A Cut Above Tree Care +4 more$40kMultiple Award
Contract source

Awarded vendors

  • A Cut Above Tree Care
  • Bull Moose Land Services
  • Miguel Soto
  • Summitt Forests, Inc.
  • Vegetation Management West, LP

Description

The Sevenmile Creek Pre-Commercial Thinning Project is a contract for forestry services, specifically pre-commercial thinning, to be performed in Wyoming. The contract was awarded to multiple vendors, including A Cut Above Tree Care, Bull Moose Land Services, Miguel Soto, Summitt Forests, Inc., and Vegetation Management West, LP. The contract duration varies by vendor, ranging from 365 days to 730 days. The contract value also varies by vendor, with a grand total ranging from $17,065.00 to $66,466.40. The scope of work includes pre-commercial thinning services, with specific details and requirements outlined in the contract documents. Key considerations for this contract include the type of services required, the contract duration, and the contract value. • The contract requires pre-commercial thinning services to be performed in Wyoming. • The contract duration varies by vendor, ranging from 365 days to 730 days. • The contract value also varies by vendor, with a grand total ranging from $17,065.00 to $66,466.40. • The scope of work includes specific details and requirements outlined in the contract documents. • The contract was awarded to multiple vendors, including A Cut Above Tree Care, Bull Moose Land Services, Miguel Soto, Summitt Forests, Inc., and Vegetation Management West, LP.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
NAICS
115310
Solicitation №
0459-C

Contract value

$40,000

The contract value varies by vendor, with a grand total ranging from $17,065.00 to $66,466.40. The average contract value is approximately $40,000.00. This estimate is based on the bid results section, which lists the bid amounts for each vendor. The contract value may be influenced by factors such as the scope of work, contract duration, and vendor experience.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Confederated Tribes of the Colville Reservation·Washington

Top match · 72%

San Poil Forest, 3 commercial thinning contracts

Closes 11/2/2026Opened 10/14/2026

Confederated Tribes of the Colville Reservation·Washington

69% match

San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027

Closes 11/17/2026Opened 10/28/2026

Oregon Department of Fish and Wildlife·Oregon

68% match

Whaleback and Huckleberry Meadow Enhancement 2026-27 Slash/Pile Project

Closes 11/2/2026Opened 10/13/2026

Confederated Tribes of the Colville Reservation·Washington

67% match

San Poil Forest, 3 commercial thinning contracts

Closes 11/2/2026Opened 10/14/2026

St. Johns River Water Management District·Florida

66% match

Sunnyhill Restoration Area, West Tract 2027 Timber Sale

Closes 11/10/2026Opened 10/26/2026

SC Forestry Commission·South Carolina

66% match

FM 012 ADV TS 27 Weather Station

Closes 9/10/2027Opened 8/18/2026

Washington County, Oregon·Oregon

66% match

Early Tree Removal for Capital Project Services

Closes 11/6/2026Opened 10/26/2026

Oregon Wasco County Soil & Water Conservation District·Oregon

65% match

Contractor pool for fuels reduction and habitat restoration

Closes 11/30/2026Opened 10/28/2026

City of Austin·Texas

65% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

St. Johns River Water Management District·Florida

65% match

Sunnyhill Restoration Area, West Tract 2027 Timber Sale

Closes 11/10/2026Opened 10/26/2026

St. Louis County, MN - Purchasing Division·Minnesota

65% match

Stream Mitigation Bank Development

Closes 11/9/2026Opened 10/19/2026

City of Ashland·Oregon

64% match

City of Ashland, Ashland Creek Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

City of Gaithersburg·Maryland

64% match

Construction Services for Rabbitt Road Stream and Vegetative Buffer Restoration

Closes 11/9/2026Opened 9/15/2026

Oregon City of Ashland·Oregon

64% match

Ashland Water Treatment Plant

Closes 11/5/2026Opened 9/29/2026

Georgia Bulloch County Board of Commissioners·Georgia

64% match

Mill Creek Parking Lot FDR Project

Closes 11/20/2026Opened 10/29/2026

Snohomish County PUD·Washington

64% match

PWC - Lake Stevens Circuit 12-124; Transmission and Distribution Line Clearance

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of The Interior·Oklahoma

64% match

OK - OZARK PLATEAU NWR - Timber Stand Improvement

Closes 11/11/2026Opened 10/30/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

64% match

AMRP, Rocky Glen Pond, Moosic Bgh, Lackawanna Cnt

Closes 12/3/2026Opened 10/30/2026

Florida St. Johns River Water Management Dist·Florida

64% match

Sunnyhill Restoration Area, West Tract 2027 Timber Sale

Closes 11/10/2026Opened 10/26/2026

Texas Department of Transportation·Texas

64% match

LOCAL LET MAINTENANCE CONTRACT, JEFFERSON CO, TREE TRIMMING AND BRUSH REMOVAL

Closes 11/17/2026Opened 10/20/2026

Oregon Department of Fish and Wildlife·Oregon

64% match

Large Wood Harvest Staging - Anthony Creek Uplift

Closes 11/16/2026Opened 10/21/2026

U.S. Department Of Defense·Louisiana

64% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

Town of Cutler Bay·Florida

63% match

Cutler Bay US-1 Beautification Project-Phase 1

Closes 1/13/2027Opened 10/23/2026

Pennsylvania Department of Conservation and Natural Resources Bureau of Forestry, Silviculture Section·Pennsylvania

63% match

Moshannon State Forest Timber Stumpage Sale – Silent Whistle

Closes 12/9/2026Opened 9/28/2026

U.S. Department Of Defense·Louisiana

63% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026