Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Water and Wastewater
  5. ›Sewer Rehabilitation - Cambridge Street Area (S23-1) / DPWP

Awarded contract·City of Worcester·Massachusetts

Sewer Rehabilitation - Cambridge Street Area (S23-1) / DPWP

Won by Insituform Technologies$4.3MSingle Award
Contract source

Awarded vendors

  • Insituform Technologies

Description

This contract covers the complete rehabilitation of the Cambridge Street sewer interceptor system in Worcester, MA, including pipe lining, manhole rehabilitation, and associated temporary bypass works. The awardee, Insituform Technologies, will perform the base scope and the optional Alternate 2 (structural cured‑in‑place pipe), delivering trench‑pipe work, geopolymer lining, service‑connection grouting, and related mobilization. The project requires compliance with Massachusetts prevailing‑wage statutes, performance and payment bonds equal to 100 % of the contract sum, and adherence to strict time‑is‑of‑the‑essence provisions (150‑day base schedule, 180‑day if an alternate is included). • Scope: Geopolymer pipe lining, CIPP installation, manhole structural rehabilitation, temporary bypass pumping, service‑connection grouting, and mobilization. • Award: Insituform Technologies (Base + Alternate 2) at an estimated total of ≈ $4.26 M. • Key Requirements: 5 % bid bond, 100 % performance/payment bonds, insurance minimums, MWBE participation, and strict noise/working‑hour limits.

Attached files

Key dates

Bids closed
9/21/2022
Contract modified
9/13/2022
Duration
150 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237120
Solicitation №
7869-W3

Contract value

$4,256,101

The bid results list Insituform Technologies’ base bid at $3,135,373 and the cost for Alternate 2 at $1,120,728, giving a combined total of $4,256,101. This aligns with the project’s estimated cost of roughly $5.7 M noted in the original solicitation comments, indicating a competitive pricing outcome. Therefore the contract’s value is estimated at about $4.3 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of West Des Moines·Iowa

Top match · 71%

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

City of Albany·Georgia

71% match

Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

Greenwood Metropolitan District·South Carolina

71% match

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

City of Cambridge·Massachusetts

70% match

FY27 Pump Station and Sewer and Stormwater Structures Inspection and Maintenance

Closes 11/19/2026Opened 10/29/2026

City of Fargo·North Dakota

70% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

Massachusetts City of Cambridge·Massachusetts

70% match

COC-CIFB-FY27-31268:FY27 Pump Station and Sewer and Stormwater Structures Inspection and Maintenance

Closes 11/19/2026Opened 10/29/2026

Portage County·Ohio

70% match

Mantua Sanitary Sewer Rehab-Bid

Rolling / TBD closeOpened 10/7/2026

City of Whitehall·Ohio

70% match

Beechbank and Broadhurst Sewer Rehabilitation

Closes 11/13/2026Opened 10/28/2026

Metropolitan Council·Minnesota

70% match

Coon Rapids 4-NS-525 Rehabilitation

Closes 11/10/2026Opened 9/24/2026

City of Cincinnati·Ohio

70% match

De Votie Avenue Sewer Replacement - Phase 2A (10240735)

Closes 11/25/2026Opened 10/28/2026

City of South San Francisco·California

69% match

2027 Sanitary Sewer Spot Repair and Rehabilitation Project

Closes 11/13/2026Opened 10/21/2026

U.S. Department Of Defense·Missouri

69% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

City of Douglas·Wyoming

69% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

Town of Honea Path·South Carolina

69% match

Chiquola and Clatworthy Subbasin Sewer Rehab Phase 3 (Division C)

Closes 11/24/2026Opened 10/23/2026

City of Philadelphia·Pennsylvania

69% match

PW Bid 2797-SEWER RECONSTRUCTION and RELAY of WATER MAINS in PECHIN ST from DUPONT ST to LEVER

Closes 11/10/2026Opened 10/23/2026

City of Ponca·Oklahoma

69% match

Ponca City Sanitary Sewer Bois D Arc' Phase III

Closes 1/30/2027Opened 1/14/2025

Town of Chase City·Virginia

69% match

Sanitary Sewer Rehabilitation

Closes 12/9/2026Opened 10/29/2026

City of Philadelphia·Pennsylvania

69% match

PW Bid 2521-SEWER RECONSTRUCTION and RELAY of WATER MAINS in MANTON ST FROM S. 8TH ST to S. 7TH ST

Closes 11/10/2026Opened 10/28/2026

New York City Department of Environmental Protection·New York

69% match

82626B0042-BWT-WI-323 Reconstruction of MSP Cone Check Valves, Actuators and Discharge Piping at Wards Island WWTP

Closes 1/4/2027Opened 8/31/2026

Connecticut Town of Fairfield·Connecticut

69% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026

City of Northampton·Massachusetts

68% match

Bright Avenue Reconstruction and Utilities Replacement

Closes 11/4/2026Opened 10/14/2026

City of Braintree·Massachusetts

68% match

Sewer System Rehabilitation - Year 13

Closes 11/5/2026Opened 10/14/2026

League of Minnesota Cities·Minnesota

68% match

SANITATION SERVICES

Closes 12/31/2029Opened 11/22/2024

City of Cincinnati·Ohio

68% match

Barrington Hills Pump Station Eliminations (10230090)

Closes 11/12/2026Opened 9/17/2026

West County Wastewater·California

68% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026