This contract awards the design‑build of stamped‑concrete medians along Federal Boulevard in Denver, covering demolition, removal, and replacement of existing pavement, curbs, gutters, asphalt mats, signage, storm‑drain protection, and associated traffic‑control devices. The work includes extensive site preparation, utility adjustments, aggregate base course placement, concrete and asphalt paving, and final striping and signage installation. The project’s estimated construction cost is between $2 M and $2.5 M, with the awarded bid at $2,337,485.43. The contract term is 270 days, and the project is subject to Davis‑Bacon prevailing‑wage requirements and a 24 % MWBE participation goal.
• Scope: Concrete median construction, demolition, utility upgrades, asphalt and concrete paving, traffic‑control hardware.
• Award: Rodriguez Construction Org, LLC (single‑award, lowest bid).
• Value: $2.34 M (award) vs. $3.33 M engineer’s estimate.
• Schedule: 270 days from award (approx. Mar 23 2026 – Dec 18 2026).
• Compliance: Davis‑Bacon wage rates, Denver minimum‑wage ($19.29/hr), 24 % MWBE goal.