The contract is for the construction of a 29’-8” long, three span, cast-in-place triple box culvert bridge across Wyman Ravine, along with the removal of an existing reinforced concrete bridge and reconstruction of approximately 800 lineal feet of roadway. The new structure will provide for 48 feet of clear roadway width, concrete barrier rails on both sides, and five-foot wide concrete sidewalks. The project involves constructing a bridge and reconstructing the roadway approaches, including 12-foot wide through lanes, a 14-foot wide northbound left turn pocket, and 5-foot wide paved shoulders.
• The project requires the removal of an existing reinforced concrete bridge.
• The new bridge will have a clear roadway width of 48 feet.
• The project includes the reconstruction of approximately 800 lineal feet of roadway.
• The roadway approaches will include 12-foot wide through lanes and 5-foot wide paved shoulders.
• The project requires the construction of concrete barrier rails on both sides of the bridge.
• The project includes the construction of five-foot wide concrete sidewalks.