The City of Yakima awarded a multi‑vendor, competitive‑bids contract for the construction of a new interceptor sewer line, lift station, and force main on Beech Street. The scope includes excavation, installation of 15‑inch and 24‑inch sewer mains, construction of multiple 48‑inch and 72‑inch manholes, rock excavation, back‑fill, property restoration, and optional pavement‑overlay work. The contract was split into two schedules: Schedule A (lump‑sum) awarded to Apollo Inc. for $1.64 M and Schedule B awarded to a consortium of four firms for $5.10 M, bringing the total contract value to roughly $6.7 M. The bid opening occurred on 28 April 2017 and the City Manager’s award was signed on 9 May 2017.
• Scope: interceptor, lift‑station, force main, new 15‑in. & 24‑in. mains, multiple manholes, site work, and optional asphalt overlay.
• Vendors: Apollo Inc. (Schedule A) and a consortium (Scout Lake, Rotschy, TTC Construction, POW Contracting) on Schedule B.
• Financials: Total contract ≈ $6.7 M (incl. 8.2 % tax), with separate lump‑sum amounts for each schedule.