The City of Wilmington is procuring a municipal interior renovation of the fourth floor of the Skyline Center building. The work includes demolition, installation of metal‑framed gypsum demising walls, new door veneers, acoustic ceiling tiles, and floor finishes (carpet tiles or luxury vinyl plank). Two optional alternates provide additional tenant‑fit‑out space and extra wall work. The contract will be awarded on a single‑prime‑bid basis, with a 5 % bid bond, a 14 % M/WBE subcontracting goal, and a construction period of 120 calendar days plus a 20‑day final completion window. Bids were opened on 9 Jan 2025; the award decision has not been released.
• Base scope: 225 lf of 9‑ft metal‑framed gypsum walls, doors, windows, and acoustic ceiling.
• Alternate #1: 1,840 sf tenant renovation in Suite D.
• Alternate #2: 110 lf additional gypsum walls.
• M/WBE participation required; bid bond = 5 % of bid.