The Pavement Preservation Project 2023 involves clearing and grubbing, traffic control, polymer modified asphaltic emulsion seal coat, type II micro-surfacing, asphaltic emulsion (fog seal coat), thermoplastic striping and markings, and signage, all in conformance with the California Department of Transportation 2018 Standard Specifications. The project is located throughout Butte County, California. The contract was awarded to VSS International, Pavement Coatings Co., and Sierra Nevada Construction, Inc. The engineer's estimate for the project was $723,155.65, and the bid amounts ranged from $954,459.00 to $997,007.00.
• The project involves multiple contract items, including mobilization, traffic control, and pavement preservation.
• The contract was advertised on June 7, 2023, and bids were opened on June 29, 2023.
• The project is expected to be completed in accordance with the California Department of Transportation 2018 Standard Specifications.
• The subcontractor listings include Chrisp Company, Gallaway Enterprises, and Statewide Safety Systems.
• The bid summary sheets provide a detailed breakdown of the contract items and bid amounts.