The contract is for the purchase of an articulated boom lift, with a quotation request issued by Kern County. The awarded vendor is Evergreen Specialty Services, with a total cost of $76,628.88. The contract includes a 2-year warranty for parts and labor, and a 5-year structural warranty. The delivery timeframe is 45 days, and the payment terms are net 30. The contract also includes a local vendor preference calculation, but the awarded vendor does not meet the 5% preference. Key features of the boom lift include a working max height of 51'6", a horizontal max reach of 24'8", and a platform capacity of 500lbs.
• The contract includes a 2-year warranty for parts and labor, and a 5-year structural warranty.
• The delivery timeframe is 45 days, and the payment terms are net 30.
• The contract includes a local vendor preference calculation, but the awarded vendor does not meet the 5% preference.
• The boom lift has a working max height of 51'6", a horizontal max reach of 24'8", and a platform capacity of 500lbs.
• The contract was awarded to Evergreen Specialty Services, with a total cost of $76,628.88.