The City of Independence, Missouri invited bids for the replacement of siding and insulation on Sludge House #4 at the Courtney Bend Water Plant. The contract includes the removal of existing siding, installation of a walk-through door, and application of insulation on the inside of the structure. The bid was recommended to be awarded to Southtown Glass, Inc based on the apparent low bid. The key features of the contract include:
• Removal of existing siding
• Installation of a walk-through door
• Application of insulation on the inside of the structure
• The contract was recommended to be awarded to Southtown Glass, Inc based on the apparent low bid.