This contract awards Restored Foundation a $7,200 roof‑replacement job for the residential property at 1859 Diggs Avenue, Mobile, AL, under the City of Mobile’s Critical Repair Program. The work follows detailed specifications that require complete removal of existing roofing, structural inspection and repair, deck preparation, flashing, vent work, installation of a 30‑year Class A fiberglass asphalt shingle system, and a one‑year leak‑free warranty. Real‑time photographic documentation to the city inspector is mandatory, and a building permit is required for any wood replacement.
• Scope: full roof removal, structural repairs, deck work, underlayment, high‑quality shingle installation, flashing, vent and ridge‑vent installation, and post‑install warranty.
• Compliance: must meet ICC Residential Code and local building codes; permits needed for wood work.
• Documentation: continuous photo evidence required; contractor must provide warranty for one year.