The Measure C Pearson Rd Improvements Project involves the installation of either SAMI-R or Microsurface, Type A HMA Overlay, HMA Dike, roadway excavation, and drainage culvert replacements. The project has a DBE goal of 7.0%. The contract was awarded to Franklin Constr., LAMON Constr., and Knife River based on their bid amounts. The project manager is Marc A Mattox, and the town clerk is Joanna Batierry. Key aspects of the project include:
• Installation of SAMI-R or Microsurface
• Type A HMA Overlay
• HMA Dike
• Roadway excavation
• Drainage culvert replacements
• DBE goal of 7.0%