The contract is for the Lake Hills Connector – SE 5th St Storm Repair project, which involves the installation of a storm drain manhole, CCTV inspection of storm drain pipes, coordination with CenturyLink, and other related work. The project is managed by the City of Bellevue, and the engineer's estimate is $20,000.00. The contract was bid on, but no bids were received.
• The project includes installation of a 48-inch Type 2 Storm Drain Manhole or Type 1-L Storm Drain Catch Basin.
• The project includes CCTV inspection of all three storm drain pipes coming into or out of the repair area.
• The project includes coordination with CenturyLink to allow them to re-locate a cross bore while the contractor excavates and performs other work.
• The project includes other related work such as mobilization/demobilization, traffic control, pipe cleaning, pre-construction CCTV inspection, water pollution and erosion control, water bypass system, backfilling, and all site restoration.