The Outagamie County Materials Recovery Facility (MRF) canopy addition is a ~7,500 sf single‑story structure to protect recycling equipment and provide an employee break area. The contract is a traditional design‑bid‑build project, using AIA A101/A201 forms with a stipulated‑sum (firm‑fixed‑price) arrangement. Boldt was awarded the contract and will be responsible for delivering the full scope, including demolition of existing pavement, spread footings, steel columns, metal wall panels, and a standing‑seam metal roof, while complying with extensive Wisconsin code requirements and a tight construction schedule that avoids daytime production hours. The project must be substantially completed by 30 Sep 2025, with a mandatory site‑visit on 5 Mar 2025 and bid submission deadline of 18 Mar 2025.
• Scope: demolition, foundations, steel erection, metal wall and roof systems, HVAC, fire‑protection, and warranty provision.
• Schedule: start 20 Feb 2025 – finish 30 Sep 2025 (≈ 7 months).
• Procurement: sealed competitive bid, award to Boldt; bid value $587,500; bonding (5 % bid bond, performance & payment bonds equal to contract sum).