The contract is for the removal and installation of floor covering at the Wyoming Life Resource Center. The contract was awarded to Wyoming Windows and Cabinets, with a total bid amount of $12,889.11. The scope of work includes the removal of existing floor coverings and the supply and installation of new floor covering campus-wide. Key points to consider when evaluating this contract include the type of floor covering to be installed, the size of the area to be covered, and the timeline for completion.
• The contract involves the removal of existing floor coverings and the installation of new floor covering.
• The contract was awarded to Wyoming Windows and Cabinets.
• The total bid amount for the contract is $12,889.11.
• The scope of work includes the removal of existing floor coverings and the supply and installation of new floor covering campus-wide.