The contract is for the construction of a parking lot at Hot Springs State Park in Wyoming. The contract was awarded to three vendors: Owl Creek Excavation, Inc., Wyoming Earthmoving Corporation, and Sedmak Construction. The total bid prices for each vendor were $83,900.00, $95,748.00, and $121,300.00 respectively. The contract requires the vendors to provide a 10% bid bond and to upload a copy of the Surety 2000 document if using it. A mandatory pre-bid meeting was held on June 9, 2020, at Hot Springs State Park.
• The contract is for a parking lot construction project
• The project is located at Hot Springs State Park in Wyoming
• Three vendors were awarded the contract
• The total bid prices for each vendor were $83,900.00, $95,748.00, and $121,300.00 respectively
• A 10% bid bond is required
• A copy of the Surety 2000 document is required if using it
• A mandatory pre-bid meeting was held on June 9, 2020