Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Civil Engineering
  5. ›Professional Design Services for 1st Avenue- River Road to…

Awarded contract·City of Tucson, Department of Transportation and Mobility·Arizona

Professional Design Services for 1st Avenue- River Road to Grant Road.

Won by HDR Engineering, Inc.$3MSingle Award
Contract source

Awarded vendors

  • HDR Engineering, Inc.

Description

The City of Tucson has awarded a contract to HDR Engineering, Inc. for professional design services for the 1st Avenue- River Road to Grant Road project. The contract involves the development of a Design Concept Report (DCR) for roadway and drainage improvements, including the replacement of the existing 1st Avenue bridge over the Rillito River. The project scope includes data gathering, survey and right-of-way tasks, and design survey. The contract has a duration of 18 months and involves various subconsultants. The key aspects of the contract include the development of a DCR, reconstruction of the 3-mile corridor, and inclusion of on-site storm drain and off-site cross-drainage improvements. • The project involves the development of a DCR for the 1st Avenue corridor. • The contract includes the replacement of the existing 1st Avenue bridge over the Rillito River. • The project scope involves data gathering, survey and right-of-way tasks, and design survey. • The contract has a duration of 18 months. • The contract involves various subconsultants, including Kittelson & Associates, Inc. and EPS Group, Inc. • The project includes reconstruction of the 3-mile corridor as a modernized four-lane median-separated roadway. • The contract includes on-site storm drain and off-site cross-drainage improvements. • The project involves the development of a right-of-way reference file and the creation of a 3D MicroStation annotated survey file.

Attached files

Key dates

Starts
2/7/2024
Ends
12/31/2025
Duration
18 months

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
541330
Solicitation №
230193-01

Contract value

$3,000,000

The contract value is not explicitly stated in the document, but based on the scope of work and the involvement of various subconsultants, it can be estimated to be in the range of $1 million to $5 million. The contract involves the development of a Design Concept Report (DCR) for roadway and drainage improvements, which is a significant undertaking. Additionally, the contract has a duration of 18 months, which suggests a substantial amount of work and resources required. However, without more specific information on the contract value, this estimate is rough and based on general industry standards.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Ramsey County·Minnesota

Top match · 73%

Vadnais Boulevard Professional Design Services

Closes 11/12/2026Opened 10/19/2026

City of Newberg·Oregon

72% match

River Street Rebuild 2027

Closes 11/9/2026Opened 10/12/2026

Massachusetts City of Pittsfield·Massachusetts

71% match

Designer Services

Closes 11/4/2026Opened 10/14/2026

City of San Bernardino·California

71% match

Professional Design Engineering Services for Safe Streets and Roads for All (SS4A) Implementation Grant Plan

Closes 11/18/2026Opened 10/21/2026

City of Ontario·California

71% match

Engineering Design Services for the Turner Avenue Storm Drain and Street Improvement Project (SM2701)

Closes 11/12/2026Opened 10/15/2026

Roanoke City Government·Virginia

71% match

RFP # SOL1369, Engineering Design Services for Cove/Peters Creek Pedestrian Improvements

Closes 12/3/2026Opened 10/26/2026

City of Thornton·Colorado

70% match

Quebec Street Widening - North of 136th Avenue

Closes 11/20/2026Opened 10/1/2026

Pasco County Sheriff·Florida

70% match

RSQ-2FY27 Professional Design and Post Design Services for the Pasco Sheriff’s Office Forward Operations Center (FOC)

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of The Interior·Minnesota

70% match

MN FERGUS FALLS WMD PRKING REHAB

Closes 11/10/2026Opened 10/28/2026

Charleston·South Carolina

70% match

Professional Services

Rolling / TBD closeOpened 5/15/2023

City of Alhambra·California

70% match

PROFFESIONAL ENGINEERIGN DESIGN SERVICES (PS&E) FOR FY26/27 RMRA STREETS REHABILITATION PROJ

Closes 11/5/2026Opened 9/21/2026

Massachusetts City of Taunton·Massachusetts

69% match

Design Services for Danforth Street Bridge

Closes 11/12/2026Opened 10/14/2026

Tampa-Hillsborough County Expressway Authority·Florida

69% match

P-0826 Parks Design Services

Closes 11/13/2026Opened 10/2/2026

North Carolina City of Raleigh·North Carolina

69% match

Capital Boulevard Corridor Design

Closes 11/13/2026Opened 10/6/2026

Fort Pierce Utilities Authority·Florida

69% match

Architectural Professional Engineering and/or Design Services

Closes 11/9/2026Opened 10/9/2026

WAPDD·Arkansas

69% match

Public Notice of RFQ for Professional Services

Rolling / TBD closeOpened 9/6/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

69% match

Retention of Design Professional Firms – Open‑End Architectural, Landscape Architectural & Engineering Services (FDC‑500‑825)

Closes 11/3/2026Opened 10/2/2026

Connecticut Town of East Windsor·Connecticut

68% match

Architectural & Engineering Services

Closes 11/13/2026Opened 10/22/2026

Massachusetts Town of Avon·Massachusetts

68% match

Designer On Call Services

Closes 11/18/2026Opened 10/28/2026

Maryland City of Rockville·Maryland

68% match

RFP 04-27 King Farm Farmstead Master Plan Phase 1 for Design Services

Closes 12/1/2026Opened 10/7/2026

Cobb County, GA·Georgia

68% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Richland School District Two·South Carolina

68% match

Architecture-Engineering (A/E) Service for a Welcome Center and Community Hub

Closes 11/6/2026Opened 10/16/2026