This contract is for the replacement of flooring at two schools, French Middle School and Topeka West High School. The contract includes the installation of new flooring, as well as the removal and disposal of the old flooring. The contract also includes allowances for field changes and concrete repairs. The total bid for the project is $118,040.00 for Fox Ceramic Tile and $124,960.00 for Hall Floor Covering.
• The contract includes the installation of new flooring at French Middle School and Topeka West High School.
• The contract includes the removal and disposal of the old flooring.
• The contract includes allowances for field changes and concrete repairs.
• The total bid for the project is $118,040.00 for Fox Ceramic Tile and $124,960.00 for Hall Floor Covering.
• The contract was awarded to Fox Ceramic Tile and Hall Floor Covering.