Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alaska guideAlaska Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Alaska
  4. ›Manufacturing
  5. ›Fabrication Steel Module Structure

Awarded contract·Alaska Energy Authority·Alaska

Fabrication Steel Module Structure

Won by Weona Corporation$1.2MSingle Award
Contract source

Awarded vendors

  • Weona Corporation

Description

This contract calls for the design, fabrication, painting, and delivery of a single prefabricated steel module to be used in the Kipnuk Power Systems Upgrade. The module will be fabricated in two shipping splits, include structural steel, interior/exterior panels, partitions, insulation, lifting eyes, and all necessary hardware, and will be shipped to the Alaska Energy Authority’s FOB point in Anchorage. The work is performed under a competitive invitation‑to‑bid process, with the award made to the lowest responsive and responsible bidder. • Scope: Full fabrication of a 17‑ft‑wide, 11‑ft‑6‑in‑high steel module (including structural steel, paint finish, insulation, and hardware). • Delivery: Vendor must provide a 15‑week delivery window from order receipt and give 48‑hour advance notice before shipping to the AEA warehouse. • Procurement: Competitive ITB, lump‑sum price, net‑30 payment terms, with progress reporting every two working days and staged inspections.

Attached files

Key dates

Bids closed
11/3/2015
Contract modified
10/22/2015

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Manufacturing
NAICS
332313
Solicitation №
ITB 16068

Contract value

$1,200,000

The solicitation does not disclose a contract ceiling, but the module’s dimensions (17 ft × 11.5 ft), the need for structural steel, custom welding, insulation, painting, and two‑split shipping suggest a substantial fabrication effort. Comparable prefabricated steel modules of similar size in remote Alaskan projects typically range from $800,000 to $1.5 million, depending on material grades, finish specifications, and logistics. Assuming mid‑range material costs, a moderate profit margin, and the 15‑week delivery requirement, a reasonable ballpark estimate for this contract is roughly $1.2 million.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Defense·United States of America

Top match · 64%

MODULE ASSEMBLY,RIM

Closes 1/29/2027Opened 9/1/2026

U.S. Department Of Defense·United States of America

64% match

MODULE ASSEMBLY,UHF

Closes 1/21/2027Opened 10/20/2026

U.S. Department Of Defense·United States of America

63% match

MODULE ASSEMBLY,RIM

Closes 2/12/2027Opened 10/29/2026

Virginia Commercial Space Flight Authority·Virginia

60% match

RFP 27.130300-003-007 Structural Steel for Liquid Nitrogen (LN2) Tanks

Closes 11/5/2026Opened 10/8/2026

U.S. Department Of Defense·Pennsylvania

59% match

DISCHARGE MODULE

Closes 11/9/2026Opened 6/10/2026

U.S. Department Of Defense·United States of America

58% match

DISCHARGE MODULE

Closes 11/9/2026Opened 9/9/2026

U.S. Department Of The Treasury·District of Columbia

58% match

Cooling Tower, Roofing, and Structural Construction

Closes 11/9/2026Opened 10/8/2026

Texas A&M University System·Texas

58% match

Specialized Vessel Fabrication

Closes 11/3/2026Opened 10/20/2026

Matanuska Telecom Association·Alaska

57% match

CGC Mechanical Plans

Rolling / TBD closeOpened 10/8/2026

Virginia Department of Transportation·Virginia

57% match

161277 Fabricated Structural Steel

Closes 11/2/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

57% match

15--PANEL,STRUCTURAL,AI

Closes 12/3/2026Opened 10/29/2026

Virginia Polytechnic Institute and State University·Virginia

57% match

VT Forestry Research Operations Center

Closes 11/23/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

57% match

PANEL,STRUCTURAL,AI

Closes 11/5/2026Opened 10/6/2026

York Technical College·South Carolina

57% match

YTC - Welding Expansion - Building D

Closes 11/12/2026Opened 10/9/2026

York Technical College·South Carolina

57% match

YTC - Welding Expansion - Building D **READVERTISEMENT - Documents May Be Obtained From Location**

Closes 11/12/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

57% match

61--MODULE HIGH VOLTAGE

Closes 11/2/2026Opened 9/18/2026

U.S. Department Of Defense·United States of America

57% match

CONTROL MODULE

Closes 11/10/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

57% match

15--PANEL,STRUCTURAL,AI

Closes 12/3/2026Opened 10/29/2026

U.S. Department Of Defense·Oklahoma

56% match

ColdSectionModule_End_Item_F100_NSN_2840015806609NZ_PN_4089012-800

Closes 11/6/2026Opened 9/22/2026

Washington Parks & Recreation Commission, State·Washington

56% match

SW Region Cross Bracing Fabrication

Closes 12/15/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

56% match

16--MODULES,SWTCHG VALV, IN REPAIR/MODIFICATION OF

Closes 11/15/2026Opened 9/30/2026

U.S. Department Of Defense·United States of America

56% match

16--NRP,MODULE ASSEMBLY, IN REPAIR/MODIFICATION OF

Closes 11/20/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

56% match

16--MAIN MODULE ASSY

Closes 11/1/2026Opened 9/17/2026

Oregon Health and Science University·Oregon

56% match

Construction Manager/General Contractor for the RLSB-7 Shell Build-out Project

Rolling / TBD closeOpened 4/21/2021

U.S. Department Of Defense·Oklahoma

56% match

F100CoreModuleContainer_End_Item_F100_NSN_8145014524579NZ_PN_P4078843

Closes 11/12/2026Opened 10/9/2026