This solicitation is for the design, clearing, and installation of a landscaped barrier between Ocoee High School and an adjacent townhouse development. The barrier will be approximately 530 feet long and at least 10 feet wide, primarily using Graceful Gracilis bamboo. The contractor must perform utility locates, clear the site, plant the bamboo, and provide 40 days of post‑planting watering. A site walkthrough is scheduled for 5/12/2026. The project is funded by Orange County Public Schools and was awarded in May 2026.
• Scope: site clearing, utility locating, bamboo planting (≈ 530 ft × 10 ft), and 40 days of irrigation.
• Requirements: insurance, no bid or performance bonds, and compliance with OCPS specifications.
• Timeline: bid due 5/15/2026, award anticipated 5/26/2026; site walk‑through 5/12/2026.
Attached files
The award documents live at the source — open the contract source above to download them.