The City of La Porte sought bids for the removal and replacement of a belt filter press system at the Wastewater Treatment Plant. The project includes all materials, equipment, labor, supervision, and appurtenances required to complete the project. A pre-bid site visit was mandatory, and the bid submission date was March 25, 2021. However, all bids were rejected by the Council on April 26, 2021. Key aspects of the project include:
• Replacement of the existing belt filter press system
• Complete removal and disposal of the existing system
• Installation of a new belt filter press system
• Provision of all materials, equipment, labor, supervision, and appurtenances required to complete the project
• Mandatory pre-bid site visit
• Bid submission date: March 25, 2021
• All bids were rejected by the Council on April 26, 2021