The contract is for the improvement of the exit drive at the Stockton Airport. The project includes the widening of the existing main parking lot exit drive, the construction of two new return vehicular lanes, and the installation of power and communications cabling. The contractor will also be responsible for installing a gate operator and traffic arm, and a ticket kiosk. The bid recap section lists the prices submitted by each vendor, with the lowest bid being $75,950.00 from Robert Burns Construction.
• The project requires the contractor to include all power and communications wiring to create an operational and functioning parking exit.
• The contractor will be responsible for installing a gate operator and traffic arm, and a ticket kiosk.
• The bid recap section lists the prices submitted by each vendor.
• The lowest bid was $75,950.00 from Robert Burns Construction.
• The bid submission date was January 30, 2014, at 5:00 PM EST.