Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›EXIT DRIVE IMPROVEMENTS

Awarded contract·San Joaquin County·California

EXIT DRIVE IMPROVEMENTS

Won by Robert Burns Construction +5 more$76kMultiple Award
Contract source

Awarded vendors

  • Robert Burns Construction
  • MCI Engineering
  • Stat-X General Engineering
  • American Asphalt
  • BC Construction
  • T&S Intermodal Maintenance

Description

The contract is for the improvement of the exit drive at the Stockton Airport. The project includes the widening of the existing main parking lot exit drive, the construction of two new return vehicular lanes, and the installation of power and communications cabling. The contractor will also be responsible for installing a gate operator and traffic arm, and a ticket kiosk. The bid recap section lists the prices submitted by each vendor, with the lowest bid being $75,950.00 from Robert Burns Construction. • The project requires the contractor to include all power and communications wiring to create an operational and functioning parking exit. • The contractor will be responsible for installing a gate operator and traffic arm, and a ticket kiosk. • The bid recap section lists the prices submitted by each vendor. • The lowest bid was $75,950.00 from Robert Burns Construction. • The bid submission date was January 30, 2014, at 5:00 PM EST.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
6891

Contract value

$75,950

Based on the bid recap section, the lowest bid for the project was $75,950.00 from Robert Burns Construction. However, it is not clear if this is the final contract value or if there were any additional costs or changes to the project. Assuming the lowest bid is the final contract value, the estimated value of the contract is $75,950.00. However, if the contract was awarded to a different vendor or if there were any changes to the project, the actual contract value may be different.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Lynchburg·Virginia

Top match · 63%

IFB 2027-029 TSA EXIT LANE TERMINAL EXPANSION

Closes 12/9/2026Opened 10/28/2026

City of Shawnee·Kansas

62% match

Resolution No. 2056

Closes 4/22/2030Opened 4/22/2025

City of Lynchburg·Virginia

62% match

TSA EXIT LANE TERMINAL EXPANSION

Closes 12/9/2026Opened 10/28/2026

National Aeronautics And Space Administration·Alabama

61% match

TECHNOLOGY TRANSFER OPPORTUNITY: Aerospace Vehicle Entry Flightpath Control (TOP2-303)

Closes 8/10/2027Opened 8/10/2026

Berkeley County·South Carolina

61% match

Paslay Drive Right-Of-Way Improvements

Closes 11/30/2026Opened 10/27/2026

City of Doge City·Kansas

60% match

Red Demon Drive Improvements (due 11/03 @ 1:45pm)

Rolling / TBD closeOpened 9/25/2026

Calhoun County Board of County Commissioners·Florida

60% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

The Ride Solution·Florida

60% match

BUS DEPOT IMPROVEMENT - CONSTRUCTION PHASE

Closes 11/6/2026Opened 8/26/2026

National Aeronautics And Space Administration·United States of America

60% match

TECHNOLOGY TRANSFER OPPORTUNITY: Aerospace Vehicle Entry Flightpath Control (TOP2-303)

Closes 8/10/2027Opened 8/10/2026

Massachusetts City of Brockton·Massachusetts

60% match

BID FOR: Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson

Closes 11/19/2026Opened 10/22/2026

NYS East Fishkill, Town of·New York

60% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Easley·South Carolina

60% match

North Dale Drive Drainage System Improvements

Closes 1/28/2027Opened 10/16/2026

Iowa Transportation·Iowa

60% match

Iowa DOT Repair Shop Annex Overhead Door Tracks

Closes 11/10/2026Opened 10/25/2026

Delta Airport Consultants·Virginia

59% match

COMING SOON - Richmond, VA - Richmond Executive-Chesterfield Airport - Extend Runway 15-33 (20030)

Rolling / TBD closeOpened 5/1/2026

Charleston County·South Carolina

59% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

City of Killeen·Texas

59% match

Rosewood Drive & Aspen Drive Intersection Improvements

Closes 11/12/2026Opened 10/26/2026

Trumbull County, OH·Ohio

59% match

TRU-GENESE AVENUE/ ELM ROAD INTERSECTION IMPROVEMENTS

Closes 11/23/2026Opened 10/30/2026

NYS Monroe County·New York

59% match

Traffic Signal Replacement: South Clinton Avenue @ Elmwood Avenue

Closes 12/1/2026Opened 10/29/2026

Maryland Department of Natural Resources - Administration·Maryland

59% match

Nana Drive Entry Doors Replacement & Stabilization Repairs

Closes 11/6/2026Opened 9/30/2026

Township of Mahwah·New Jersey

59% match

MTB #26-03 IMPROVEMENTS TO CORPORATE DRIVE-PHASE 1 AND 2

Closes 11/5/2026Opened 10/8/2026

City of Shawnee·Kansas

59% match

Ordinance No. 3494

Closes 7/16/2031Opened 7/16/2024

Iowa Department of Transportation·Iowa

59% match

Iowa DOT Repair Shop Annex Overhead Door Tracks

Closes 11/10/2026Opened 10/27/2026

City of Glendale·California

59% match

FORD F-350 OR EQUAL CHASSIS CAB EXTENDED CAB SINGLE WHEEL DRIVE WITH SERVICE BODY LUMBER RACK AND LIFTGATE

Closes 11/12/2026Opened 10/30/2026

Raleigh Durham Airport Authority·North Carolina

58% match

Taxiway J Rehabilitation

Closes 11/30/2026Opened 10/26/2026

Massachusetts Arlington Housing Authority·Massachusetts

58% match

Entry Door Upgrade at State Aided Development

Closes 11/13/2026Opened 10/29/2026