The contract is for the sanitary sewer repair at 515 158th Place SE. The scope of work includes the removal of asphalt concrete pavement, cement concrete pipe, and the installation of new PVC pipe, fittings, and appurtenances. The project also involves the placement and compaction of crushed gravel surfacing and hot mix asphalt. The engineer's estimate for the project is $69,867.00. The bid results show that Kamins Construction is the apparent low bidder with a quote of $83,515.30.
• The project involves the repair of sanitary sewer lines
• The scope of work includes the removal and installation of various materials
• The project requires the placement and compaction of crushed gravel surfacing and hot mix asphalt
• The engineer's estimate for the project is $69,867.00
• The bid results show that Kamins Construction is the apparent low bidder with a quote of $83,515.30