This sealed‑bid public‑works contract calls for a complete interior renovation of the Department of Public Facilities office space at 50 Officer Manny Familia Way, Worcester, MA. The scope includes demolition of existing finishes, asbestos/VAT floor abatement, new metal‑stud framing, drywall, acoustic ceiling installation, electrical and plumbing upgrades (including an on‑demand hot‑water heater), full door‑core replacement with specific thicknesses, and comprehensive painting and finishing work. The City supplies certain materials (paint for Suite C2 and casework), while the contractor provides labor, equipment, and all other supplies, must meet prevailing‑wage, MWBE, and safety requirements, and secure performance and payment bonds. The contract is a single‑award, firm‑fixed‑price renovation expected to be substantially completed by mid‑June 2022.
• Required work: demolition, asbestos/VAT abatement, framing, drywall, ceiling tiles, electrical, plumbing, door hardware, paint, and final finishes.
• Mandatory certifications: prevailing‑wage compliance, MWBE reporting, wage‑theft prevention, CORI/Gender‑Identity policy acknowledgment.
• Bonding/insurance: 5 % bid security; 100 % performance and payment bonds; listed insurance minimums.