This contract calls for the complete asbestos abatement of the steam tunnel (and associated water‑pump station) at the Dual Language Magnet School in Worcester, MA. The selected contractor must remove all asbestos‑containing pipe insulation and contaminated soil, work under full containment with negative‑air pressure, provide decontamination, handle waste disposal per federal, state and local regulations, and submit extensive documentation (daily logs, waste shipment records, certified payroll, clearance testing) for final payment. The project must be finished by August 21 2026 and requires the contractor to hold a Massachusetts asbestos‑abatement license, provide required bonds, insurance, and meet MWBE and wage‑theft certifications.
• Scope: full removal of asbestos‑containing materials in a steam tunnel, containment, disposal, and post‑clearance testing.
• Schedule: bid deadline July 22 2026; work must be completed by August 21 2026.
• Mandatory compliance: 454 CMR 28.0 licensing, OSHA 10‑hour training, EPA/NESHAP waste handling, MWBE participation, prevailing‑wage certification, and performance/bond requirements.