The Los Gatos Creek Bridge Replacement Project involves the removal and demolition of an existing steel and timber bridge and the construction of three separate concrete pre-cast bridges. The project also includes the installation of No. 10 turnouts, minor reconfiguration of the existing rail signal system, and the construction of two separate retaining wall systems along the creek bank. The engineer's estimate for this project is over $15,000,000. The key aspects of this contract include:
• Bridge replacement with concrete pre-cast bridges
• Installation of turnouts and reconfiguration of the rail signal system
• Construction of retaining wall systems
• Earthwork and slope stabilization
• Habitat mitigation and monitoring