The City of Roseville Electric Department is soliciting bids to provide all labor, materials, delivery, and installation for Industrial Substation 15Kv Metal-clad Switchgear. The contract was awarded to Crown Technical Systems Inc. with a grand total of $814,004.41. The bid summary sheet and other documents related to the bid are available for download. The key information about the contract includes the type of switchgear, the bidder's name, city, and state, and the grand total of the bid.
• The contract is for the provision of 15kV Metal-clad Switchgear.
• The bidder awarded the contract is Crown Technical Systems Inc.
• The grand total of the bid is $814,004.41.
• The bid summary sheet and other documents related to the bid are available for download.